Closed bridge in Shariatpur stifling trade for half a decade
Skip to main content
  • Home
  • Economy
  • Stocks
  • Analysis
  • World+Biz
  • Sports
  • Features
  • Epaper
  • More
    • Subscribe
    • COVID-19
    • Bangladesh
    • Splash
    • Videos
    • Games
    • Long Read
    • Infograph
    • Interviews
    • Offbeat
    • Thoughts
    • Podcast
    • Quiz
    • Tech
    • Archive
    • Trial By Trivia
    • Magazine
    • Supplement
  • বাংলা
The Business Standard

Wednesday
July 06, 2022

Sign In
Subscribe
  • Home
  • Economy
  • Stocks
  • Analysis
  • World+Biz
  • Sports
  • Features
  • Epaper
  • More
    • Subscribe
    • COVID-19
    • Bangladesh
    • Splash
    • Videos
    • Games
    • Long Read
    • Infograph
    • Interviews
    • Offbeat
    • Thoughts
    • Podcast
    • Quiz
    • Tech
    • Archive
    • Trial By Trivia
    • Magazine
    • Supplement
  • বাংলা
WEDNESDAY, JULY 06, 2022
Closed bridge in Shariatpur stifling trade for half a decade

Transport

Kazi Moniruzzaman
31 December, 2021, 01:00 pm
Last modified: 31 December, 2021, 01:02 pm

Related News

  • No more toll at Postogola, two other bridges from 1 July
  • Top 10: World’s longest bridges
  • Breakfast in Dhaka, lunch in Shariatpur: Tale of a roundtrip via Padma Bridge
  • Dream Padma Bridge on steel spans
  • Padma Bridge has the deepest piling in the world

Closed bridge in Shariatpur stifling trade for half a decade

While the fate of the bridge has been hanging in the balance for the past several years, locals have suffered

Kazi Moniruzzaman
31 December, 2021, 01:00 pm
Last modified: 31 December, 2021, 01:02 pm
The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS
The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS

The Golam Mawla Bridge in Shariatpur's Naria upazila has been off-limits to traffic for the past six years, leading to enormous suffering for commuters in the nearby upazilas. As the bridge is closed off, heavy vehicles now have to take a 15-kilometre detour which has stifled and increased the cost of doing business in the area.

The Golam Mawla Bridge was built over the River Kirtinasha in FY1997-98 to facilitate smooth communication between Naria, Jajira, Vedorganj upazilas and Dhaka by road, but it was closed in 2015 due to safety concerns.

A bailey bridge was built for pedestrians later.

The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS
The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS

The LGED took an initiative to build a new bridge next to the old bridge. The construction cost of the 145-metre bridge was estimated at Tk14.87 crore and on 21 December 2017, Navana Construction was given the work order.

According to the work order, construction was supposed to end in June 2019. But even after multiple extensions, the bridge was not completed.

The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS
The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS

By June 2020, only two of the four piers and one of the two abutment walls were completed. Eventually, the LGED cancelled the work order and one more year elapsed.

As the fate of the bridge kept hanging in the balance, locals continued to suffer.

Abdus Salam, a trader in Naria Bazar, said his business had declined tremendously since the bridge had been closed. "We have been facing significant trouble transporting goods and have lost a lot of customers which has been harmful to our business," he added.

The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS
The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS

Md Haris, of Nariaupazila, is building a house but due to the bridge being closed, he now has to transport the construction materials through a detour. "The detour has increased my construction cost considerably," he complained.

In December 2021, the construction of a modified GolamMawla flyover was inaugurated and Kohinoor Enterprise was assigned the task at an estimated cost of Tk28.86 crore. The new bridge will have a length of 327 metres and the project is supposed to end in June 2024. Locals hope the contractor will this time sincerely complete the bridge, unlike the last time.

The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS
The closed Golam Mawla Bridge in Shariatpur’s Naria upazila has impeded trade in the nearby areas while causing locals to suffer. Photo: TBS

Shahabuddin Khan, upazila engineer of LGED said, once completed, the new bridge will mobilise trade in the region again. "We are hopeful that the bridge will be completed within the stipulated time," he added.

Bangladesh / Top News / Infrastructure

Shariatpur / bridge / Golam Mawla Bridge

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • China-led trade bloc holds promise, with some caveats
    China-led trade bloc holds promise, with some caveats
  • British Chancellor of the Exchequer Rishi Sunak listens as British Prime Minister Boris Johnson addresses his cabinet on the day of the weekly cabinet meeting in Downing Street, London, Britain June 7, 2022. Leon Neal/Pool via REUTERS
    UK Johnson plunged into crisis as Sunak, health minister quits
  • Representational Image. Photo: Pixabay
    Load shedding the best course of action for now: Experts

MOST VIEWED

  • Bikers hold human chain demanding journey home on motorcycles
    Bikers hold human chain demanding journey home on motorcycles
  • Two RNB members held for selling tickets in black market
    Two RNB members held for selling tickets in black market
  • Photo: TBS
    Slow toll collection causes 5 km long tailback on Mawa expressway on first day
  • Photo: TBS
    Ferry services from Mawa terminal to continue: State minister
  • Vehicles ply the Padma Bridge on Sunday marking the beginning of a new era for the country’s southern region. The bridge was inaugurated on 25 June amid much fanfare. PHOTO: MUMIT M
    Bikes to be allowed on Padma Bridge after installing CCTVs, speed ​​gun: Minister
  • Picture: TBS
    Transports increase on Dhaka-Khulna highway after Padma Bridge opens to public

Related News

  • No more toll at Postogola, two other bridges from 1 July
  • Top 10: World’s longest bridges
  • Breakfast in Dhaka, lunch in Shariatpur: Tale of a roundtrip via Padma Bridge
  • Dream Padma Bridge on steel spans
  • Padma Bridge has the deepest piling in the world

Features

The OPEC+ group of 23 oil-exporting countries met virtually on Thursday. Photo: Bloomberg

OPEC+ did its job, but don’t expect it to disappear

12h | Panorama
Mirza Abdul Kader Sardar with AK Fazlul Haque, Chief Minister of Bengal, at Haque's reception at the Lion Cinema, Dhaka, 1941. Photo: Collected

Panchayats: Where tradition clings to survival

13h | Panorama
Illustration: TBS

Universal Pension Scheme: Has it been thought through?

15h | Panorama
Last month Swapan Kumar Biswas, the acting principal of Mirzapur United College, was forced to wear a garland of shoes for ‘hurting religious sentiments.’ Photo: Collected

Where do teachers rank in our society?

1d | Panorama

More Videos from TBS

Sheikh Kamal Business Incubator to be inaugurated at CUET Wednesday

Sheikh Kamal Business Incubator to be inaugurated at CUET Wednesday

4h | Videos
Tejgaon becoming uninhabitable for illegal rickshaw garages, truck stands

Tejgaon becoming uninhabitable for illegal rickshaw garages, truck stands

4h | Videos
50 companies plan to invest big in South

50 companies plan to invest big in South

5h | Videos
Alal, Dulal sell for Tk30 lakh

Alal, Dulal sell for Tk30 lakh

6h | Videos

Most Read

1
Photo: Collected
Africa

Uganda discovers gold deposits worth 12 trillion USD

2
TBS Illustration
Education

Universities may launch online classes again after Eid

3
Meet the man behind 'Azke amar mon balo nei'
Splash

Meet the man behind 'Azke amar mon balo nei'

4
Build Dhaka East-West Elevated Expressway, relocate kitchen markets: PM
Bangladesh

Build Dhaka East-West Elevated Expressway, relocate kitchen markets: PM

5
File Photo: BSS
Energy

India pulls out of LoC funding for part of Rooppur power transmission work

6
Illustration: TBS
Interviews

‘No Bangladeshi company has the business model for exporting agricultural product’

EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Privacy Policy
  • Comment Policy
Copyright © 2022
The Business Standard All rights reserved
Technical Partner: RSI Lab
BENEATH THE SURFACE
Workers ready a passenger vessel with a fresh coat of paint to the deck ahead of the Eid-ul-Azha at a dockyard at Mirerbagh in South Keraniganj. The vessel getting the makeover plies the Bhandaria route and will take holidaying people from the city to their country homes. Eid will be celebrated on 10 June this year. The photo was taken on Monday. Photo: Mumit M

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net