India-Bangladesh to build waterways over Brahmaputra River
Skip to main content
  • Home
  • Economy
  • Stocks
  • Analysis
  • World+Biz
  • Sports
  • Features
  • Epaper
  • More
    • Subscribe
    • COVID-19
    • Bangladesh
    • Splash
    • Videos
    • Games
    • Long Read
    • Infograph
    • Interviews
    • Offbeat
    • Thoughts
    • Podcast
    • Quiz
    • Tech
    • Archive
    • Trial By Trivia
    • Magazine
    • Supplement
  • বাংলা
The Business Standard

Wednesday
June 29, 2022

Sign In
Subscribe
  • Home
  • Economy
  • Stocks
  • Analysis
  • World+Biz
  • Sports
  • Features
  • Epaper
  • More
    • Subscribe
    • COVID-19
    • Bangladesh
    • Splash
    • Videos
    • Games
    • Long Read
    • Infograph
    • Interviews
    • Offbeat
    • Thoughts
    • Podcast
    • Quiz
    • Tech
    • Archive
    • Trial By Trivia
    • Magazine
    • Supplement
  • বাংলা
WEDNESDAY, JUNE 29, 2022
India-Bangladesh to build waterways over Brahmaputra River

Infrastructure

TBS Report
23 March, 2022, 10:25 am
Last modified: 23 March, 2022, 12:21 pm

Related News

  • Utilising waterways: When common home-goers show the way
  • About 8,480km of Bangladesh's waterways can be used for transportation: State Minister
  • Necessity of basin-wide management for water transit and trade
  • Bangladesh-India connectivity to help Tripura in trade, development 
  • Inland waterway trade can boost Bangladesh economy: Speakers

India-Bangladesh to build waterways over Brahmaputra River

A ship repair facility at Pandu is also being built as part of the project for the development of the waterway

TBS Report
23 March, 2022, 10:25 am
Last modified: 23 March, 2022, 12:21 pm
Photo: Collected
Photo: Collected

India is working to build an Inland Waterway Transport (IWT) mode over Brahmaputra River, said the Indian Ministry of Ports, Shipping and Waterways.

India and Bangladesh are jointly developing the Indo-Bangladesh protocol routes to improve the connectivity between the national waterways to boost inland navigation in the North East, reports Assam Tribune.

A ship repair facility at Pandu is also being built as part of the project for the development of the waterway.

Currently, vessels in the North Eastern Region (NER) are taken to Kolkata through Bangladesh for dry dock repair. The project – to be built by 2025 – is said to beneficial for North Eastern Regions.

Besides that, fairways are being developed in Sunderbans to enable vessels to navigate through the Indo-Bangladesh protocol routes.

Bhutan has identified Inland waterways as an alternate mode of transportation for trade in Bangladesh due to lower transportation cost, larger shipment size compared to road, as well as avoiding congestion on land routes.

With the accessibility of IWT mode, trade between India and Bangladesh is expected to increase and generate more traffic growth on the national waterways.

Trading in North Eastern Regions through IWT mode is expected to continue and reach a significant scale in future.

 

 

Top News

Waterways / Indo-Bangladesh / inland water transport (IWT)

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • The Group of Seven leaders gather for a lunch at the Schloss Elmau hotel in Elmau, Germany on 27 June 2022. Photo: Reuters
    G7 discussions with China, India on Russian oil price cap positive -source
  • Budget’s highest priority is to tame inflation: PM
    Budget’s highest priority is to tame inflation: PM
  • Photo: Collected
    Student arrested for killing Savar teacher with cricket stump

MOST VIEWED

  • Photo: Mumit M
    Rowshan hails Padma Bridge as a symbol of self-respect
  • Pitch-black water from factories running through a canal in Keraniganj on the outskirts of the capital, and draining into the Buriganga River. Photo: Salahuddin Ahmed
    No personal harm to anyone while recovering water bodies: LGRD minister
  • Advance tax hits construction sector hard: Entrepreneurs
    Advance tax hits construction sector hard: Entrepreneurs
  • Photo: Collected
    A tale of two bridges, where people still go number 2
  • Padma Bridge: Around Tk2 crore toll collected on second day 
    Padma Bridge: Around Tk2 crore toll collected on second day 
  • Photo: Collected
    Ecnec clears a Tk1,092cr project to widen Cox’s Bazar Marine Drive

Related News

  • Utilising waterways: When common home-goers show the way
  • About 8,480km of Bangladesh's waterways can be used for transportation: State Minister
  • Necessity of basin-wide management for water transit and trade
  • Bangladesh-India connectivity to help Tripura in trade, development 
  • Inland waterway trade can boost Bangladesh economy: Speakers

Features

Mahathir accused financial titans of seeking to reverse decades of economic development that propelled tens of millions into the middle class. Photo: Bloomberg

George Soros, Mahathir and the legacy of 1997

8h | Panorama
 If Bangladesh produces and exports high-value-added MMF products right now, we can increase our total export by around 25% in value. Photo: Mumit M

Time ripe for Bangladesh RMG sector to focus more on man-made fibres

11h | Panorama
Human Library Bangladesh has organised so far nine sessions; eight have been held in different parts of Dhaka and one in Khulna. Photo: Courtesy

Human Library Bangladesh: Where the halls come alive with human voices

13h | Panorama
Abortion is a part of healthcare. Photo: Bloomberg

Abortion is healthcare and women’s rights are human rights

1d | Panorama

More Videos from TBS

Severodonetsk now under Russian control

Severodonetsk now under Russian control

42m | Videos
South African boy drove ambition, says Elon's father

South African boy drove ambition, says Elon's father

42m | Videos
Why Dollar crisis will last long?

Why Dollar crisis will last long?

52m | Videos
Beautiful mural at Padma bridge

Beautiful mural at Padma bridge

4h | Videos

Most Read

1
Padma Bridge from satellite. Photo: Screengrab
Bangladesh

Padma Bridge from satellite 

2
Photo: TBS
Bangladesh

Motorcycles banned on Padma Bridge 

3
Japan cancels financing Matarbari coal project phase 2
Bangladesh

Japan cancels financing Matarbari coal project phase 2

4
Photo: Courtesy
Corporates

Gree AC being used in all parts of Padma Bridge project

5
Photo: TBS
Infrastructure

Gains from Padma Bridge to cross $10b, hope experts

6
Desco wanted to make a bold statement with their new head office building, a physical entity that would be a corporate icon. Photo: Courtesy
Habitat

Desco head office: When commitment to community and environment inspires architecture

EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Privacy Policy
  • Comment Policy
Copyright © 2022
The Business Standard All rights reserved
Technical Partner: RSI Lab
BENEATH THE SURFACE
An aerial view of a MRT Line-6 construction site. Work on the first elevated metro rail of Bangladesh is going on in full swing. A total of 16 elevated stations will connect the capital’s Uttara to Motijheel via Mirpur, Farmgate and Dhaka University. The photo was taken from Farmgate area recently. Photo: Rajib Dhar

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net