Captive power generation should not cease until quality grid power is ensured: Industrialists
Skip to main content
  • Home
  • Economy
  • Stocks
  • Analysis
  • World+Biz
  • Sports
  • Splash
  • Features
  • Videos
  • Long Read
  • Games
  • Epaper
  • More
    • COVID-19
    • Bangladesh
    • Infograph
    • Interviews
    • Offbeat
    • Thoughts
    • Podcast
    • Quiz
    • Tech
    • Subscribe
    • Archive
    • Trial By Trivia
    • Magazine
    • Supplement
  • বাংলা
The Business Standard
WEDNESDAY, MAY 18, 2022
WEDNESDAY, MAY 18, 2022
  • Home
  • Economy
  • Stocks
  • Analysis
  • World+Biz
  • Sports
  • Splash
  • Features
  • Videos
  • Long Read
  • Games
  • Epaper
  • More
    • COVID-19
    • Bangladesh
    • Infograph
    • Interviews
    • Offbeat
    • Thoughts
    • Podcast
    • Quiz
    • Tech
    • Subscribe
    • Archive
    • Trial By Trivia
    • Magazine
    • Supplement
  • বাংলা
Captive power generation should not cease until quality grid power is ensured: Industrialists

Energy

TBS Report
07 November, 2020, 10:15 pm
Last modified: 07 November, 2020, 10:19 pm

Related News

  • Russia's Inter RAO to halt power exports to Finland due lack of payment
  • Second unit of Payra 1,320MW power plant resumes production
  • Bangladesh opts to sell surplus power to neighbours
  • Bangladesh, India set to formalise electricity sharing system
  • Internal conflict leaves lone prepaid meter maker out of production for a year

Captive power generation should not cease until quality grid power is ensured: Industrialists

Captive power generation systems are 32% less efficient than conventional power plants, said the director general of Power Cell

TBS Report
07 November, 2020, 10:15 pm
Last modified: 07 November, 2020, 10:19 pm
File Photo: Mumit M/TBS
File Photo: Mumit M/TBS

Electricity generation has improved and load shedding has decreased dramatically in Bangladesh in the last decade, but the time to stop captive power generation has not come yet as industries still suffer from low voltage electricity and a poor power supply. 

Industrialists and stakeholders expressed this opinion at a webinar titled "Potentials and Possibilities for Replacing Captive Generation with Quality Grid Supply" on Saturday. 

They said that the power division should ensure the quality of the electricity supply before shutting down the captive power generation facilities. 

At the webinar, Mohammad Hossain, director general of Power Cell, presented the keynote paper on the power sector's current status and the share of captive power generation in the country. 

In his presentation, Mohammad Hossain stated that captive power generation needs to cease as it is 32% less efficient than conventional power plants.

He also suggested that the power distribution companies provide uninterrupted electricity supply to industries. 

However, during the panel discussion, Managing Director of Energypac Limited Humayun Rashid opposed the Power Cell director general's statement by saying, "90% of captive power generation systems also have co-generation capacity; therefore, one cannot accept the statement that captive power systems are inefficient."

Humayun Rashid said the Power Division is penalising independent power producers for not properly supplying electricity. But, there is no compensation for the industries that suffer damage caused by the poor electricity supply from power distribution companies. 

So, if the power sector wants to stop captive power generation, it should guarantee an uninterrupted and standard electricity supply. 

Echoing the Energypac Limited's managing director, former director of the Bangladesh Textile Mills Association Razeeb Haider said there is no alternative to using captive power until an uninterrupted electricity supply is ensured. 

Energy advisor of the Consumers Association of Bangladesh Professor Dr Shamsul Alam said recent discussions on captive power apparently showed that the Power Division never worked with a proper plan. 

"Once, industries were called for taking gas connections to generate captive power, but now the Power Division wants to shut such systems," he said. 

"If it [the Power Division] stops gas supply to captive power generating systems, then who will take liability for the factory owners' investments in setting up such systems?" he asked. 

In his speech as a special guest, Dr Sultan Ahmed said captive power generation can be stopped on condition of the electricity supply improving and that has to be done through consultation with entrepreneurs. 

He said, "Captive power was required to meet demand. But now another kind of reality has arisen and we cannot waste our precious energy because of a system with low efficiency." 

Mollah M Amzad Hossain, editor at Energy and Power magazine, moderated the discussion while other officials from the power sector – including managing directors of the Dhaka Power Distribution Company Limited and Dhaka Electric Supply Company Limited – spoke at the programme.  

Bangladesh / Top News

Electricity / National Grid / power supply / Captive Power Generation / Captive power

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • Social safety budget to stay same despite inflation rise
    Social safety budget to stay same despite inflation rise
  • RMG makers worried over move on power tariff hike
    RMG makers worried over move on power tariff hike
  • A packet of US five-dollar bills is inspected at the Bureau of Engraving and Printing in Washington March 26, 2015. REUTERS/Gary Cameron
    Dollar hits Tk100 mark in open market

MOST VIEWED

  • BPC will sell cheap bulk LPG to private companies due to low bottling capacity
    BPC will sell cheap bulk LPG to private companies due to low bottling capacity
  • Photo: UNB
    Equipment import delay threatens Barapukuria coal production
  • IDCOL invests $2b in 25 years
    IDCOL invests $2b in 25 years
  • Representational image of power plant.
    Construction of ongoing coal, LNG-based power plants must be suspended: TIB 
  • A worker holds a nozzle to pump petrol into a vehicle at a fuel station in Mumbai, India, May 21, 2018. REUTERS/Francis Mascarenhas/File Photo
    Enough petrol in reserve, no chance of crisis: EMRD
  • Representational Image. Photo: Collected
    Bangladesh has adequate fuel oil reserve: Energy Division

Related News

  • Russia's Inter RAO to halt power exports to Finland due lack of payment
  • Second unit of Payra 1,320MW power plant resumes production
  • Bangladesh opts to sell surplus power to neighbours
  • Bangladesh, India set to formalise electricity sharing system
  • Internal conflict leaves lone prepaid meter maker out of production for a year

Features

Despite Bangladesh having about 24,000 km of waterways, only a few hundred kilometres are covered by commercial launch services. Photo: Saad Abdullah

Utilising waterways: When common home-goers show the way

13h | Panorama
Illustration: TBS

How Putin revived Nato

15h | Panorama
The reception is a volumetric box-shaped room that has two glass walls on both the front and back ends and the other two walls are adorned with interior plants, wood and aluminium screens. Photo: Noor-A-Alam

The United House: Living and working inside nature

15h | Habitat
Pcycle team members at a waste management orientation event. Photo: Courtesy

Pcycle: Turning waste from bins into beautiful crafts

16h | Panorama

More Videos from TBS

The first mosque in India was built Prophet Mohammad time

The first mosque in India was built Prophet Mohammad time

6h | Videos
After six decades ,the Archies is back

After six decades ,the Archies is back

6h | Videos
Exporters in discomfort, expatriates preferring Hundi

Exporters in discomfort, expatriates preferring Hundi

6h | Videos
Can your coworker be your closest friend?

Can your coworker be your closest friend?

16h | Videos

Most Read

1
Representative Photo: Pixabay.
Bangladesh

Microplastics found in 5 local sugar brands

2
Mushfiq Mobarak. Photo: Noor-A-Alam
Panorama

Meet the Yale professor who anchors his research in Bangladesh and scales up interventions globally

3
The story of Bangladesh becoming a major bicycle exporter
Industry

The story of Bangladesh becoming a major bicycle exporter

4
How Bangladesh can achieve edible oil self-sufficiency with local alternatives
Bazaar

How Bangladesh can achieve edible oil self-sufficiency with local alternatives

5
Govt tightens belt to relieve reserve
Economy

Govt tightens belt to relieve reserve

6
Impact of falling taka against US dollar
Banking

Taka losing more value as global currency market volatility persists

The Business Standard
Top
  • Home
  • Entertainment
  • Sports
  • About Us
  • Bangladesh
  • International
  • Privacy Policy
  • Comment Policy
  • Contact Us
  • Economy
  • Sitemap
  • RSS

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net

Copyright © 2022 THE BUSINESS STANDARD All rights reserved. Technical Partner: RSI Lab